Remodeling

Bathroom Remodels

Walk-in showers, tub-to-shower conversions, heated floors. Brian runs these end to end.

Pricing Free estimate

Walk-in showers, double-vanity layouts, heated floors, tile work, tubs converted to showers. From small refresh to full gut. Brian came up through bathroom remodels at L Design Strategies before the merger — this is the work he's been doing the longest, and he runs it himself end to end.

What's included

  • Walk-in showers and tub-to-shower conversions
  • Double-vanity and storage layouts
  • Heated floors
  • Tile and grout work
  • Plumbing rough-in and fixture install
Common questions

Frequently asked

How long does a full bath remodel take?

Typical full bath remodel: 2-3 weeks start to finish. Demo + rough-in week 1, tile + fixtures week 2, finish work + punch list week 3. Smaller refreshes (tile-only, vanity-only) can wrap in a week. We give you a real schedule on the estimate.

Can you handle tub-to-shower conversions?

Yes — one of the most common requests we run. We handle the plumbing reroute, the new pan + drain, the tile work, the glass enclosure, and the trim. Done right, the result is a walk-in shower that feels like it was always there.

Have a project in mind?

Free in-home consultation. We'll measure, plan, and quote in writing — no commitment.

Get a free estimate Call (618) 540-9073